|
|
Construction Staking Services
The first large project was the construction staking on the Golden East Crossing Mall in Rocky Mount, North Carolina in 1985. Joyner Keeny, PLLC provided all of the construction staking services on the 82 acre site from streets, sewers and building column lines to light poles and striping. The project lasted for 2 years and started the company on its way to providing quality surveying services for various clients. Joyner Keeny, PLLC utilizes the most modern surveying technology to perform the construction staking assignments such as GPS – RTK equipment, Robotic total stations, and field laptop computers.
Joyner Keeny, PLLC is pleased to announce that we are now offering Digital Terrain Modeling for machine controlled grading and construction. Joyner Keeny, PLLC is producing 3D Digital Terrain Models (DTM) compatible with all types of machine control systems. The experience gained from more than 20 years of traditional construction staking and computation, combined with the latest computer and GPS technology, allows us to offer a unique service that can be specifically tailored to the needs of your project.
- Building corners and column lines
- Bridges for highway construction
- Heavy Highways and Interstate Highways
- Airports
- Commercial Sites
- Shopping Centers
- Utilities
- Earthwork volumes
- Residential Subdivisions
- DTM modeling for Machine Control
Sample Construction Projects
Year |
Length/Ac |
Name |
Location |
| 1985 – 1987 |
82 ac. |
Golden East Mall |
Rocky Mount, NC |
| 1989 – 1990 |
6 mi |
VA Rte. 288 |
Chesterfield, VA |
| 1990 -1992 |
8 mi |
US 52 |
Lexington, NC |
| 1990 - 1992 |
5 mi |
VA Rte. 664 |
Chesapeake, VA |
| 1995 - 1996 |
0.5mi |
Rock Mount/Wilson Airport - Runway extension |
Elm City, NC |
| 1997 - 1999 |
6 km |
US 17 |
Bertie Co., NC |
| 1999 – 2002 |
16 km |
US 17 Bypass |
Elizabeth City, NC |
| 2001 – 2002 |
150 ac. |
Universal Leaf |
Nashville, NC |
| 2001 – 2002 |
40 ac. |
Nash Central High School |
Nashville, NC |
| 2002 – 2004 |
10 mi |
I-95 |
Halifax-Nash Co., NC |
| 2002 – 2005 |
7.4 km |
US 64 |
Creswell, NC |
| 2003 - 2006 |
3.8 mi |
Davis Drive |
Cary, NC |
| 2003 – 2006 |
2.5 km |
East Wake Expressway |
Knightdale, NC |
| 2004 – 2007 |
30 ac. |
Rocky Mount Sports
Complex |
Rocky Mount, NC |
| 2005 – Present |
9.6 mi |
US 17 Bypass |
Windsor, NC |
| 2007 – Present |
2.6 mi |
Fire Tower Road |
Greenville, NC |
| 2007 – Present |
16 ac. |
Wal-Mart Super Center |
Nashville, NC |
Sample Digital Terrain Modeling Projects
Year |
Length/Ac |
Name |
Location |
| 2005 – 2007 |
36 ac. |
Bertie Co. Middle School |
Windsor, NC |
| 2005 – Present |
9.6 mi |
US 17 Bypass |
Windsor, NC |
| 2007 – Present |
2.6 mi |
Fire Tower Road |
Greenville, NC |
| 2007 – 2008 |
16 ac. |
Wal-Mart Super Center |
Nashville, NC |
Special Equipment Owned
- Leica 399 and 9500 GPS Receivers – Survey grade: Static and RTK
- Trimble R8 GPS Receivers – Survey Grade: Static, RTK, and VRS.
- Trimble, Geodimeter, and Topcon Robotic Total Stations and Data Collectors.
- Microstation, Terramodel, and Auto-Cad Computer Software.
|